Safeco Field is the home for the Seattle Mariners baseball team. With a retractable roof and real grass field, this sports facility is quite impressive. The 3 panel roof weighs 22 million pounds and takes 7 minutes to open/close. Safeco field has 9 elevators and 11 escalators.

The electrical design of Safeco field consists of five-4000 Amp and one-1200 Amp switchboard feeding the main facility and one-2500 Amp switchboard feeding the Central Plant and Parking Garage. Emergency power is provided by an 800 KW generator feeding a 1600 Amp emergency switchboard. The majority of the circuit breakers used in this facility were Siemens solid state breakers with LSIG trip functions and Siemens thermal magnetic breakers.

Project Information
Studies Performed Short Circuit & Protective Device Coordination
# of Nodes696
Devices Plotted80
Time Current Curves32